For hip and ridge capping specialized shingle accessories may be used that have their own set of manufacturer s instructions.
Step by step roof installation.
Attach he ridge cap shingles with two nails each.
Rent tools and trucks for any project at the home depot.
If the plumbing vent is close to the peak of the roof lap the shingles over the peak of the roof.
There are three systems including glue down torch.
For a sturdy foundation roof mount flashings should be bolted to your roof rafters.
Roll roofing is made from the same asphalt composition material as shingles and it s easier to install.
There are three types of batteries used in solar storage.
Position the ridge cap shingles over the ridge vent.
If you re installing an off grid system or a grid tie system with a battery backup the last step of installation for your system will be to install a battery bank.
Never step on any of the ladder rungs above the roof.
Above the roof edge so you ll have something to hang on to as you step onto and off the roof.
Set up scaffolding to install the drip edge and first few courses.
Eave trim also referred to as drip edge is the first piece of trim that will be installed on your metal roof.
Corrugated r panel pbr panel and western rib 7 2 panel.
The final step in the roof installation process is to conclude with hip and ridge shingle application.
Extend the top of the ladder at least 3 ft.
This step by step installation article specifically covers eave trim installation for an exposed fastener panel such as.
Don t worry if you don t own all of the tools needed to complete this diy project.
Attach the plastic ridge vent with 3 roofing nails.